Description
Mapei Shower Waterproofing Kit – Complete Bathroom & Shower Tanking System
The Mapei Shower Waterproofing Kit is a complete waterproofing solution for preparing internal bathroom and shower areas before installing ceramic tiles or natural stone. It combines a flexible liquid waterproofing membrane, substrate primer and waterproofing tape to create a continuous waterproof barrier beneath the finished tile covering.
The kit contains 5kg of Mapei Mapegum WPS, 0.5kg of Shower Waterproofing Kit Primer and a 10m roll of Shower Waterproofing Tape. Together, these components provide the essential materials for waterproofing suitable shower walls, bathroom floors and other internal wet areas before tiling.
Designed for application by brush or roller, the system incorporates flexible waterproofing tape at vulnerable junctions, including internal corners, board joints, pipe penetrations and connections between walls and shower trays or baths.

What's Included in the Kit?
- Mapegum WPS – 5kg: Ready-to-use, flexible liquid waterproofing membrane for internal surfaces beneath ceramic tiles and natural stone.
- Shower Waterproofing Kit Primer – 0.5kg: Water-based primer for preparing highly absorbent and gypsum-based substrates.
- Shower Waterproofing Tape – 10m roll: Flexible waterproofing tape for sealing internal corners, board joints, pipe penetrations and wall-to-shower tray or bath junctions.
Key Benefits
- Complete Mapei waterproofing kit for showers and bathrooms.
- Designed for waterproofing beneath ceramic tiles and natural stone.
- Creates a flexible, continuous waterproof membrane.
- Approximately 4m² coverage per kit.
- Includes liquid membrane, primer and waterproofing tape.
- Suitable for application by brush or roller.
- Helps protect vulnerable corners, joints and penetrations.
- Suitable for approved plasterboard, gypsum-based and cementitious substrates.
- Can be used on suitable existing ceramic tile and natural stone surfaces with the specified additional primer.
- Suitable for domestic and commercial internal shower installations.
Suitable Applications
The Mapei Shower Waterproofing Kit is designed for internal waterproofing applications before tiling, including:
- Domestic shower enclosures.
- Commercial shower facilities.
- Bathroom walls and floors.
- Moisture-resistant plasterboard installations.
- Gypsum plaster and suitable gypsum-based substrates.
- Cementitious render and concrete surfaces.
- Suitable proprietary tile backer boards.
- Existing ceramic tile and natural stone surfaces, when correctly prepared and primed.
- Shower tray and bath junctions.
Substrate Preparation
Surfaces must be solid, clean and dry, and free from dust, oil, grease, old paint and other contaminants that could affect adhesion. Construction boards must be securely fixed, rigid and installed in accordance with their manufacturer's instructions.
Minimum drying periods for new substrates before waterproofing include:
- Gypsum plaster: 4 weeks.
- Gypsum skim coat on plasterboard: 1 week.
- Sand and cement render: 2 weeks.
- Concrete: 6 weeks.
Highly absorbent and gypsum-based substrates must be treated with the supplied Shower Waterproofing Kit Primer. Ensure the primer penetrates the surface thoroughly and allow approximately 30 minutes to 2 hours for it to dry completely before applying Mapegum WPS.
Existing ceramic tiles and natural stone must be sound, thoroughly cleaned and free from loose material and contamination. These surfaces require a neat coat of Mapei Eco Prim T Plus before applying Mapegum WPS. Eco Prim T Plus is sold separately and is not included in the kit.
Waterproofing Tape Installation
Shower Waterproofing Tape should be installed at vulnerable junctions to maintain continuity of the waterproofing system.
- Internal wall corners.
- Joints between construction boards.
- Pipe penetrations.
- Junctions between walls and shower trays.
- Junctions between walls and baths.
Apply a narrow strip of Mapegum WPS, slightly wider than the tape, to the prepared surface. Embed the tape into the wet membrane, ensuring it sits flat against the substrate without creases, folds or trapped air.
For shower trays, GRP shower bases and baths, the contact surfaces must be thoroughly degreased with a suitable solvent such as acetone and lightly abraded before applying the waterproofing tape. Do not prime GRP surfaces. Follow the manufacturer's specific instructions for trimming and positioning the tape at these junctions.
Mapegum WPS Application
Apply Mapegum WPS evenly in thin coats using a brush or roller. Allow the first coat to dry before applying the next coat crossways to the first.
- Apply the membrane evenly, avoiding gaps and thin areas.
- Allow approximately 1–2 hours between coats, depending on temperature and site conditions.
- Apply sufficient material to achieve a minimum final wet thickness of 0.8mm.
- This corresponds to a minimum dry film thickness of 0.5mm.
- Ensure the waterproofing membrane is continuous across the entire treated area.
- Allow the final coat to dry before installing tiles.
Coverage & Technical Information
| Product | Mapei Shower Waterproofing Kit |
| Manufacturer | Mapei |
| Mapegum WPS quantity | 5kg |
| Primer quantity | 0.5kg |
| Waterproofing tape | 10m roll |
| Approximate kit coverage | 4m² |
| Mapegum WPS consumption | Approximately 1.2kg/m² in two coats |
| Minimum wet film thickness | 0.8mm |
| Minimum dry film thickness | 0.5mm |
| Waiting time between coats | Approximately 1–2 hours |
| Application temperature | +5°C to +35°C |
| Application method | Brush or roller |
| Intended finish | Waterproof membrane beneath tiles or natural stone |
The manufacturer's stated kit coverage is approximately 4m², equivalent to an 800mm x 800mm corner shower enclosure. Actual coverage will depend on substrate condition, surface irregularities, detailing and application technique.
When Can You Start Tiling?
Once the final coat of Mapegum WPS has been applied, allow approximately 12–24 hours before installing ceramic tiles or natural stone on absorbent substrates, depending on temperature and site conditions.
Mapei's Shower Waterproofing Kit application procedure gives the following waiting periods after installation of the complete kit:
- Absorbent substrates: 12–24 hours before tiling.
- Non-absorbent substrates: 4–5 days before tiling.
Use a suitable Mapei tile adhesive for the substrate and tile type. The manufacturer's application procedure recommends a suitable C2 cementitious adhesive or D2TE dispersion adhesive, as appropriate.
After tiling, grout joints using a suitable Mapei grout. Movement and expansion joints should be sealed with an appropriate flexible sealant, such as a compatible Mapei Mapesil product.
Important Installation Information
- For internal waterproofing beneath ceramic tiles or natural stone.
- Not intended for permanent water immersion.
- Not suitable for substrates subject to rising damp.
- Mapegum WPS must not be left exposed as the finished wearing surface.
- Existing tiles require Eco Prim T Plus, which is sold separately.
- Use the supplied primer on suitable absorbent and gypsum-based substrates.
- Follow the manufacturer's minimum film thickness and drying requirements.
- Ensure all joints, corners and penetrations are correctly sealed with the supplied waterproofing tape.
Technical Data Sheets & Installation Instructions
Always refer to the manufacturer's current technical information and installation procedure before starting work.
Frequently Asked Questions
What does the Mapei Shower Waterproofing Kit contain?
The kit contains 5kg of Mapegum WPS liquid waterproofing membrane, 0.5kg of Shower Waterproofing Kit Primer and a 10m roll of Shower Waterproofing Tape.
How much area does one kit cover?
One kit is designed to waterproof approximately 4m², equivalent to an 800mm x 800mm corner shower enclosure. Actual coverage depends on substrate conditions and detailing.
Can the kit be applied to plasterboard?
Yes. It can be used on suitable, securely fixed moisture-resistant plasterboard. The supplied primer is required on gypsum-based and highly absorbent surfaces.
Can it be used over existing tiles?
Yes, provided the existing ceramic tiles or natural stone are sound, clean and properly prepared. Mapei specifies a neat coat of Eco Prim T Plus before applying Mapegum WPS. This primer is sold separately.
How long does the waterproofing take to dry?
Allow approximately 12–24 hours before tiling on absorbent substrates. Non-absorbent substrates require approximately 4–5 days after installation of the complete kit.
Does the kit include waterproofing tape?
Yes. A 10m roll of Shower Waterproofing Tape is included for sealing corners, board joints, pipe penetrations and connections to shower trays or baths.
Can Mapegum WPS be used as the finished shower surface?
No. Mapegum WPS is designed as a waterproofing membrane beneath ceramic tiles or natural stone. It must be covered with the specified tile finish.
Can the kit be used in swimming pools?
No. This kit is intended for internal bathroom and shower waterproofing beneath tiles. It is not intended for permanent immersion or swimming pool waterproofing.
Technical Support & Product Information
Clever Shield Coatings UK supplies Mapei waterproofing products throughout the UK. For assistance with product availability or selecting the correct materials for your project, contact our team.
Clever Shield supplies products only and does not design or specify waterproofing systems. Customers and installers must establish product suitability for their project and follow the latest manufacturer technical data sheets and installation instructions.
Payment & Security
Payment methods
Your payment information is processed securely. We do not store credit card details nor have access to your credit card information.
Security

You may also be interested in
Recently viewed
What Our Customers Say
Very good 4.7/5
Exceptional Advice & Support
Hands down in all of my reviews I've done in 21+ years, Clever Shield Coatings is one I'll always remember as the staff are friendly & passionate about their job - looking out for the customer and getting the job done right first time.
Sunny
Verified customer
Fast, friendly and reliable…
Fast, friendly and reliable. I was able to get my job done quickly and my customer was happy with the prices.
Thanks.
Kamil
Verified customer
Exceptional Advice & Support
We have been using clever shield (dealing with Richard) for over 2 years. They always give good service deliveries on time and even give technical advise when needed.
JAC
Verified customer
Really helpful! great service
Spoke to technical for some advice on the product and it was really helpful, great service
Tina Mansfield
Verified customer
Great company / knowledgeable
What a great company - knowledge about the products, spent lots of time talking me through everything - if only every company was like this one !
Ostler Info
Verified customer
Great company and speedy delivery
Really great company to deal with,excellent customer service,speedy delivery will definitely recommend and use again as a satisfied customer
Del Upson
Verified customer
Great Technical Support
Great technical support and advice on wykamol products would highly recommend this company
Shirley
Verified customer
Highly Recommended
Sandra Dow
Verified customer


