A new build London Hotel in the bustling Shoreditch area of London gets the basement BS8102 treatment, Cavity drain membranes and waterproof concrete have been used to form part of a BS8102 designed scheme.
In this instance, our Type C cavity drain membranes including our high visibility yellow membranes were used, these membranes not only act as a waterproofing product but are also passed as a ground gas membrane against Radon.
A design was required to waterproof this new build space which was going to form part of the new hotel for a restaurant and office areas.
Having looked at the scheme, Wykamol was able to send over a design scheme, as well as 3D specialist drawings for installation.
When dealing with water from the ground, care must be taken to ensure dual waterproofing schemes can work together, to give the clients a dry space that can be used without any difficulty of damage to the system.
BBA-approved products with experienced installers - members of the BAC.
FREE SITE VISIT & QUOTATION AVAILABLE
· Damp Proofing
· Waterproofing and Gas Control
· Structural Repairs
· Timber Treatments
· Surface Treatments
· Members of the Basement Association Contractors
· Anti-Condensation
· Wykamol Eco Range
· ISO Therm (TIWI)
· Roof and Balcony Polymer Coatings
.
Please feel free to email or phone if you require further details.